DTE Energy Brings Power to Metamora

Detroit Edison energized the Metamora tower site today allowing E.R.S. & Motorola to continue stacking the new tower past 200′ in compliance with FAA regulations. E.R.S. is continuing to assemble the tower and tower lights as well as wire up the shelter with the generator and electronics.